WHAT A STANDARD INSTALL COVERS, AND WHAT IT DOES NOT
Schedule of charges
Most homes pay exactly the price on the website. Every package price assumes a standard installation: a single-storey home, panels on one tin or tile roof face, and a battery within 5 metres of a switchboard with room to connect. Where your home is different, this page shows how the price scales — so you can see it before you talk to us, not after.
Nothing here is charged unless it applies to your home. We check your roof, switchboard and meter at the free site check, tell you which of these apply, and put them on your written quote as their own lines. Nothing is locked in until you accept that quote.
1 · SOLAR
Panels, racking and the roof they go on
-
1.1
Two-storey roof
$303Extra height means extra access gear and a second pair of hands on the roof.
Working at height changes the job: edge protection or a platform, a longer cable run down to the switchboard, and a second installer on the roof for the whole day. The figure is a starting point; a steep pitch or hard access is confirmed at the site check.
Only my solar is going on the upper roof, the rest of the house is single storey. Does this apply?
Yes, it is the roof the panels go on that counts, not the rest of the house.
-
1.2
Each extra roof face
$182 eachPanels split over more than one face need their own runs and roof penetrations.
A package price assumes every panel on one roof face. Each extra face is another set of rails, another cable run and another roof penetration to flash and seal.
1 extra face $182 2 extra faces $363 3 extra faces $545 My north face fits most of the panels but not all. Is the rest an extra face?
Yes. Any panels on a second face count as an extra face, even at the same orientation.
-
1.3
Klip-Lok or Trimdek roof
$42 a panelClamp-on mounting for a standing-seam metal roof, with no roof penetrations.
Standing-seam roofs cannot be screwed into. The clamps that grip the seam cost more than a tin-roof foot, and the price scales with the number of panels.
12 panels $508 18 panels $762 24 panels $1,016 30 panels $1,271 -
1.4
Tilt frames on a flat roof
$54 a panelFrames to lift the panels to a working angle on a flat or very low-pitch roof.
Below about 10 degrees, panels self-clean poorly and lose output. Tilt frames set them at a working angle; the price is per panel.
12 panels $653 18 panels $980 24 panels $1,307 30 panels $1,634 -
1.5
Slate, shingle or brittle tile roof
Assessed on siteThese need slower, more careful work and specialist fixings.
-
1.6
Replacing broken or brittle tiles
Assessed on siteWe match and replace any tile that does not survive the install.
-
1.7
Scaffolding, edge protection or an elevated work platform
Assessed on siteNeeded where a roof cannot be worked safely from a ladder.
-
1.8
Bird and possum mesh around the array
Assessed on siteKeeps nesting out from under the panels.
-
1.9
Removing and disposing of an old system
Assessed on sitePanels, inverter and racking taken away and recycled.
2 · BATTERY
Storage, backup and where the battery goes
-
2.1
Backup power in a blackout
From $484What it costs to keep your essential circuits running when the grid goes down, by the kind of system.
A battery alone does not keep the lights on: the system has to be able to disconnect from the grid and carry your essential circuits. Some systems have that built in; others need a gateway wired at your switchboard. Whole-home backup is a bigger job again and is quoted on site.
Built-in backup (GoodWe ESA, SigenStor and similar) $1,150 Backup gateway, single phase $484 Backup gateway, three phase $726 Tesla Powerwall 3 Included: the Backup Gateway 2 comes with every Powerwall 3 Will my whole house run in a blackout?
Standard backup covers an agreed set of essential circuits at your board, not every appliance. Large loads such as ovens, air conditioners and EV chargers are left off unless the system is sized for them.
-
2.2
Garage or carport installation
Assessed on siteBatteries in a garage need a smoke alarm, impact protection and signage to meet the standard.
The Australian battery standard treats a garage as a habitable space with a vehicle in it: a smoke alarm, a bollard or barrier in front of the battery, and signage.
-
2.3
Wall bracing or a concrete plinth
Assessed on siteWhere a wall will not carry the battery, or it has to stand on the ground.
-
2.4
Weather enclosure for an outdoor battery
Assessed on siteShade and rain protection where there is no sheltered wall.
-
2.5
Backup wiring beyond the essential circuits
Assessed on siteStandard backup covers an agreed set of circuits at your board.
-
2.6
Powerwall 3 Expansion mounting
$206 an ExpansionEach Expansion needs its own harness and a stacking or wall-mount kit.
An Expansion stacks behind the Powerwall 3 on a stacking kit or hangs beside it on a wall kit, and joins it with a short harness. Both kits are Tesla parts.
Stacking kit, per Expansion $206 Wall-mount kit, per Expansion $206 Expansion harness, per Expansion $175 -
2.7
Adding a battery to solar you already have
Assessed on siteConnecting a new battery to an existing array or inverter, DC or AC coupled.
What it takes depends on what is there: the age and brand of the inverter, how the array is wired and what your network allows. We check all of it at the site check before we quote.
3 · EV CHARGING
Chargers, circuits and solar-aware charging
-
3.1
Three-phase or 22 kW charging circuit
Assessed on siteA dedicated three-phase circuit with its own protection and isolator for a fast charger.
-
3.2
Solar-aware charging
Assessed on siteA power sensor at your meter so the charger can follow your solar, where the charger and inverter support it.
4 · ANY INSTALLATION
Switchboards, cabling, access and the network
-
4.1
Asbestos in the roof, eaves or meter box
Assessed on siteHandled by a licensed removalist. We never drill or cut asbestos ourselves.
-
4.2
Switchboard upgrade
Assessed on siteA board with no spare space, no main switch or no RCD protection has to be brought up to standard before a system can connect.
Most boards need nothing. Where one does, the work is priced on what the board needs, from a few new circuit breakers to a new board.
-
4.3
Main switch, RCD or RCBO replacement
Assessed on siteWhere the existing protection does not meet the current wiring rules.
-
4.4
Consumer mains or service mains upgrade
Assessed on siteWhere the cable feeding your board is too small for the new load.
-
4.5
Meter box replaced, enlarged or relocated
Assessed on siteOlder boxes often have no room for the extra equipment.
-
4.6
Single phase upgraded to three phase
Assessed on siteA network job, priced by your distributor and the work at your board.
-
4.7
Surge protection device
Assessed on siteOptional protection for the inverter and your household electronics.
-
4.8
Smart meter change
Assessed on siteArranged by your electricity retailer, not by us. We tell you when one is needed.
-
4.9
Cable run beyond the standard length
From $35 a metreStandard covers the battery within 5 metres of your switchboard, and a normal inverter run.
Every extra metre is cable, conduit, clips and the time to run it. Long runs to a garage or a far wall are the usual reason.
-
4.10
Trenching and conduit to a garage, shed or studio
Assessed on siteWhere the system or charger is away from the house.
-
4.11
Concrete cutting, boring or reinstatement
Assessed on siteFor cable routes that cannot go around.
-
4.12
Network application beyond a standard connection
Assessed on siteIncluding an export limiting device where your distributor asks for one.
-
4.13
Travel outside our standard service area
Assessed on siteWe will always tell you before it applies.
How these are applied
- Prices include GST and are the prices on the day you read this. We hold the price we quote you in writing.
- Only what applies to you. Most jobs need none of these. We would rather tell you at the site check than surprise you on the invoice.
- “From” is a starting point for the common case; a steep roof, a hard-to-reach board or a long run can add to it, and you see the figure before you commit.
- Assessed on site means the work genuinely cannot be priced without seeing it, such as a switchboard, a trench or asbestos. You get a firm figure in writing before anything starts.
- Backup power has limits. Standard backup runs an agreed set of essential circuits, not the whole home, and depends on the battery’s charge and the inverter’s output. It is not for life-support equipment.
- Work by others. A meter change is done by your electricity retailer and a network upgrade by your distributor. We tell you when one is needed and help you arrange it, but we do not charge you for it.
- Safety first. If a roof or a board cannot be worked on safely or to the standard, we say so rather than quote it.
Not sure what to ask for? Start from a package.
- 10.45 kW solar + 24 kWh GoodWe ESA10.45 kW solar + 24 kWh battery$11,578 after rebates
- 13.3 kW solar + 27 kWh SigenStor13.3 kW solar + 27 kWh battery$14,439 after rebates
- 10.29 kW solar + 27 kWh Sigenergy SigenStor10.29 kW solar + 27 kWh battery$16,289 after rebates
Every price includes installation and GST, with the federal rebates taken off. Tell us which one you are looking at and we start from there. All packages →
Prices on this website are for the ACT and within 35 km of Canberra. Further out, the same system usually costs 15–30% more for travel, time away and the extended warranty responsibility that comes with distance. We confirm the final price before you commit to anything.
